Capability Maturity Model (CMM)- Software Engineering
Question 1 UGC NET June-2020 Â Choose the correct answer from the options given below: |
A – A-III, B-IV, C-II, D-I |
B – A-IV, B-III, C-I, D-II |
C – A-IV, B-III, C-II, D-I |
D – A-III, B-IV, C-I, D-II |