Capability Maturity Model (CMM)- Software Engineering
Question 1 UGC NET June-2020 Â ![]() Choose the correct answer from the options given below: |
| A – A-III, B-IV, C-II, D-I |
| B – A-IV, B-III, C-I, D-II |
| C – A-IV, B-III, C-II, D-I |
| D – A-III, B-IV, C-I, D-II |
Capability Maturity Model (CMM)- Software Engineering
Question 1 UGC NET June-2020 Â ![]() Choose the correct answer from the options given below: |
| A – A-III, B-IV, C-II, D-I |
| B – A-IV, B-III, C-I, D-II |
| C – A-IV, B-III, C-II, D-I |
| D – A-III, B-IV, C-I, D-II |