COCOMO Model Software Engineering Questions-Answers
Q1➡|COCOMO Model A simple stand – alone software utility is to be developed in ‘C’ programming by a team of software experts for a computer running Linux and the overall size of this software is estimated to be 20,000 lines of code. Considering (a, b) = (2.4, 1.05) as multiplicative and exponention factor for the basic COCOMO effort estimation equation and (c, d) = (2.5, 0.38) as multiplicative and exponention factor for the basic COCOMO development time estimation equation, approximately how long does the software project take to complete ?
Q2➡|COCOMO Model A software company needs to develop a project that is estimated as 1000 function points and is planning to use JAVA as the programming language whose approximate lines of code per function point is accepted as 50. Considering a = 1.4 as multiplicative factor, b = 1.0 as exponential factor for the basic COCOMO effort equation and c = 3.0 as multiplicative factor, d = 0.33 as exponential factor for the basic COCOMO duration equation, approximately how long does the project take to complete ?
Q9➡|COCOMO Model Consider the basic COCOMO model where E is the effort applied in person-months, D is the development time in chronological months, KLOC is the estimated number of delivered lines of code (in thousands) and ab, bb, cb, db have their usual meanings. The basic COCOMO equations are of the form
Q11➡|COCOMO Model A company needs to develop digital signal processing software for one of its newest inventions. The software is expected to have 20000 lines of code. The company needs to determine the effort in person-months needed to develop this software using the basic COCOMO model. The multiplicative factor for this model is given as 2.2 for the software development on embedded systems, while the exponentiation factor is given as 1.50. What is the estimated effort in person-months?
Q12➡|COCOMO Model A company needs to develop digital signal processing software for one of its newest inventions. The software is expected to have 40000 lines of code. The company needs to determine the effort in person-months needed to develop this software using the basic COCOMO model. The multiplicative factor for this model is given as 2.8 for the software development on embedded systems, while the exponentiation factor is given as 1.20. What is the estimated effort in person-months?
Q13➡|COCOMO Model On an average, the programmer months is given by 3.6 * (KLOC) 1.2 . If so, a project requiring one thousand source instructions will require
Q14➡|COCOMO Model The number of function points of a proposed system is calculated as 500. Suppose that the system is planned to be developed in Java and the LOC/FP ratio of Java is 50. Estimate the effort (E) required to complete the project using the effort formula of basic COCOMO given below : E = a(KLOC)b Assume that the values of a and b are 2.5 and 1.0 respectively.